We know crawler cranes the way most carriers don’t.
Crawler cranes are complex machines. A 300-ton Liebherr LR 1300 doesn’t just roll onto a flatbed — it disassembles into 10 to 15 distinct loads: carbody, upper, boom sections, counterweights, and more. We know exactly how each brand breaks down and how to stage the loads for efficient site re-assembly.
We handle the entire move — pre-move route survey, state permits for every corridor, pilot car coordination, and load sequencing — so your riggers can focus on the lift.
- ✓Cranes from 30 to 600+ tons: Liebherr, Manitowoc, Link-Belt, Sumitomo, Kobelco
- ✓All trailer types: lowboys, extendables, RGN, hydraulic platform
- ✓In-house permits for all 14+ East Coast states
- ✓Load sequencing optimized for site re-assembly
- ✓24/7 dispatch & real-time move tracking
Crawler crane transport specs.
| Crane Class | Typical Loads | Trailer Types | Permit Level |
|---|---|---|---|
| 30 – 100 Ton | 3 – 5 loads | 48/53 lowboy, step-deck | Standard OW/OD |
| 100 – 200 Ton | 5 – 9 loads | Extendable lowboy, RGN | Standard OW/OD |
| 200 – 400 Ton | 9 – 14 loads | Hydraulic platform, multi-axle | Super Load |
| 400 – 600+ Ton | 14 – 20+ loads | Hydraulic platform convoy | Super Load + Escort |
Six steps from call to clear.
Spec the Move
We collect the crane make/model, lift location, destination, and your on-site window. Quote comes back within one business hour.
Survey the Route
Our team maps every corridor — bridge clearances, weight limits, restricted zones, and staging areas — before permits are pulled.
Pull the Permits
In-house permitting for every state on the route. We handle superload approvals, multi-state coordination, and escort vehicle requirements.
Coordinate Loadout
We work with your rigging crew on load sequence and staging. Each piece has a trailer assignment and a departure window before we roll.
Move the Convoy
All loads depart per the agreed sequence. Pilot cars run front and rear on oversized loads. Our dispatch stays live 24/7 for the duration of the move.
Unload + Handoff
Loads are staged at the destination in re-assembly sequence. We confirm receipt with your site supervisor and close out the job.